Some projects start with a new customer. This one started with a familiar one. A German chemical manufacturer that already runs two Revtech systems came back to us for two more machines to dry a powder in continuous mode. At the end of October, both machines passed their Factory Acceptance Test (FAT) at our plant in Loriol-sur-Drôme, France, a month ahead of schedule. Before they leave for Germany, the team got together to celebrate.
A Returning Customer
Our customer already operates two Revtech systems. With this order, it goes from two machines to four.
For an equipment manufacturer, a repeat order is one of the strongest signs of trust a customer can give.
The Project: Continuous Powder Drying, With Cooling at the Top of the Tower
The Requirement
The customer needed to dry a powder to its own specifications, in continuous mode. Details of the product and process remain confidential.
Our Solution
Our machines combine 100% electric heating with vibratory conveying. The powder travels up an enclosed stainless steel spiral, where it is heated under a controlled atmosphere, without combustion and without batch handling. Learn more about our continuous drying systems.
For this project, the design also includes cooling at the top of the tower, so the powder is cooled before it leaves the machine.
A Successful FAT, One month ahead of schedule
Why the FAT Matters
The Factory Acceptance Test is the last major milestone before shipment. The machines run at our plant, and we check that they perform as specified before they travel to the customer’s site.
The Result
At the end of October, both machines passed their FAT.
“We even managed to complete the FAT a month ahead of schedule, and that deserves a mention.”
— Bruno Zami, Project Engineer, Revtech Process Systems
A Morning Get-Together to Say Thank You
A Tradition Bruno Started
When Bruno joined Revtech, he started a simple tradition: whenever a project reaches a major milestone, the team takes a moment to celebrate together. Everyone has come to appreciate it, because celebrating our wins is part of how we move forward together.
This time, the team met one morning over croissants, pastries and juice.
A Team Effort
Not everyone made it into the photo, but this project involved people across the company: the workshop, CAD design, automation, purchasing and accounting.
Benjamin, our Sales manager for the chemical industry, also contributed to the project and kept communication with the customer running smoothly.
Our Long-Standing Partners
We also invited our long-standing suppliers and partners, especially in metal fabrication and electrical work. Every machine we build in France owes part of its quality to these lasting relationships.
Next Stop: Germany
The machines will leave our plant soon, and installation at the customer’s site is planned for 2027. We look forward to seeing them in production, and we look forward to our next drying projects.
Have a powder drying project? Discover our continuous drying solutions or contact our team.